![]() |
![]() |
|
||||||||||||||||
![]() |
![]() |
|
||||||||||||||||
![]() |
|
|||||||||||||||||
|
|
The Needs: Ø Building Al-Bathan school: Considered the most important for solving the problem of the 900 students, as mentioned in the education section. All of its documents are ready and authorized Cost: $750 thousand dollars Ø Road-improvement subsidy in the length of 4km. It will need to be necessary to consider both quality of soil and slope. The soil should remain solid in the summer, and should resist cold temperatures in the winter. Cost: $150 thousand dollars Ø Building a water tank with the capacity of 300 cubic meters connected with the carrying line to the spring. Cost: $80 thousand dollars Ø 150 garbage and waste trucks which are necessary due to the village's wide natural areas and due to its location over aquatic sources, also, in order to protect it from pollution as it will become a tourist area. Cost: $175 thousand dollars Ø Furnishing and preparing a healthy clinic for the village. Cost: $40 thousand dollars Ø Building and furnishing a headquarters for the different foundations of the village Cost: $80 thousand dollars Ø Substantial financial contributions distributed through different laborer organizations in the city under the supervision of the council and the supporting organizations in a manner consistent with high virtues and manners. |
|
|
|||||||||||||||
|
|
|
|
||||||||||||||||
|
|
|
|||||||||||||||||
|
Designed by Siliko - 2006 |
![]() |
Copyright © Al badhan Village Council |
|
|||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|